Whatsapp: 0086-15153106200

Basic Electrical Training System Teaching Education Equipment For School Lab Electrical Automatic Trainer

Item No.: MR175E
Basic Electrical Training System Teaching Education Equipment For School Lab Electrical Automatic Trainer
Description
MR175E Basic Electrical Training System Teaching Education Equipment For School Lab Electrical Automatic Trainer

This product is used in the training of electricians (including primary, intermediate and advanced electricians). The electrician's assessment cabinet uses lighting circuits. The actual operation of the electric control circuit of the electric motor is an indispensable skill training. It is also necessary for all levels of electrician practitioners. The content of the mastery is also the examination and appraisal content stipulated by the Ministry of Labor for “Electrical Technology Grade Standard” and “Electrical Operation Certificate”. The general electrician training appraisal and assessment device includes experiments and practical operations such as lighting circuit and electric drive control circuit. Wiring and other items. In order to cultivate students' basic skills and wiring skills in practice, the electrician laboratory cabinet greatly enriches the content of classroom internship teaching, improves the quality of internship teaching, and enables students to quickly master practical skills knowledge and practice wiring skills, so that training and internships can be made. The operation is moving to a new field, which is suitable for the teaching and skills training assessment of higher vocational colleges, higher vocational schools, secondary vocational schools and technical schools.

1.1 Profile
1 Product overview
1.2 Feature
(1)Using the double-sided space position, the cabinet is equipped with single-phase watt-hour meter, fluorescent lamp, incandescent lamp, double dual-control switch, sound and light control switch, touch switch, socket, etc., and electrical equipment required to complete various lighting circuits. Control a variety of low-voltage electrical appliances, such as leakage circuit breakers, fuses, current transformers, contactors, intermediate relays, time relays, thermal relays, travel switches, buttons, signal lights, transfer switches, voltmeters, ammeters, and three-phase Four-wire watt-hour meter, etc. In order to extend the service life of the electrical appliance and reduce the material consumption, the contacts of the electrical appliances are connected to the terminals, and the students only need to wire and train on the terminals to ensure the durability of the electrical components. The technical training cabinet is also equipped with an auxiliary motor, which can be used for various experiments.
(2) The motor is fully equipped and can be used in combination to complete the training content of various courses.
(3) The training platform has a good security protection system.
2 Technical capability
(1) Input power: three-phase five-wire system 380V±10% 60Hz
(2) Dimensions: 720mm × 550mm × 1800mm
(3) Machine capacity: <1.5KVA
(4) Weight: <220kg
(5) Working conditions: Ambient temperature -10 ° C ~ +40 ° C 
Relative humidity <85% (25 ° C)


3 Product composition
3.1 Lighting circuit training part
This part contains single-phase watt-hour meter, fluorescent lamp, incandescent lamp, dual-control double-control switch, sound and light control switch, touch switch, socket, etc., to meet the teaching requirements and experimental requirements.
3.2  Electrical control part training
This part contains a variety of low-voltage electrical appliances, such as leakage circuit breakers, fuses, current transformers, contactors, intermediate relays, time relays, thermal relays, travel switches, buttons, signal lights, transfer switches, voltmeters, ammeters and three-phase four Circuit meter, etc., meet the teaching requirements and experimental requirements.
3.3  Cabinet part
(1) Three-phase five-wire power input.
(2) There are power indicator lights and safety power output terminals.
(3) Controlled by leakage circuit breaker, output three-phase power and single-phase power.
3.4 Equipped components
(1) Three-phase AC squirrel cage asynchronous motor
(2) Three-phase AC squirrel cage asynchronous motor (with centrifugal switch)
4 The experiment which can be finished 
Electrical control cabinet
Experiment 1 Direct start control of three-phase asynchronous motor
Experiment 2 Three-phase asynchronous motor contactor jog control circuit
Experiment 3 Three-phase asynchronous motor contactor self-locking control circuit
Experiment 4 three-phase asynchronous motor stator connect serial resistance step-down starting manual control circuit
Experiment 5 Three-phase asynchronous motor stator connect in serial with resistance step-down starting automatic control circuit
Experiment 6 Y-△ start automatic control circuit
Experiment 7 Contactor self-locking three-phase asynchronous motor forward and reverse control
Experiment 8 button self-locking three-phase motor contactor forward and reverse control
Experiment 9 double self-locking three-phase asynchronous motor forward and reverse control
Experiment 10 three-phase asynchronous motor one-way step-down starting and reverse braking control circuit
Experiment 11 Dynamic Braking Control of Three-phase Asynchronous Motor
Experimental 12 sequential control of three-phase asynchronous motor
Experiment 13 three-phase asynchronous motor remote and local control


Experiment 14 three-phase asynchronous motor forward and reverse jog start control circuit
Experiment 15 Workbench automatic round trip control circuit
Experiment 16 automatic round trip control circuit with jog
Experiment 17 Linkage control circuit of X62W universal milling machine spindle and feed motor
Experiment 18 C620 lathe control circuit
Experiment 19 electrical block control circuit
Experiment 20 one-way motor starting control circuit
Lighting circuit training
Experiment 21 Incandescent control circuit
Experiment 22 Fluorescent lamp control circuit
Experiment 23 Touch Switch Controls Incandescent wire
Experiment 24 voice-activated switch control stair incandescent wire 1
Experiment 25 voice-activated switch control stair incandescent wire 2
Experiment 26 installation circuit of single-phase watt-hour meter
Experiment 27 Installation of three-phase four-wire watt-hour meter (direct type)
Experiment 28 Installation of three-phase four-wire watt-hour meter (mutual inductance)
Experiment 29 Installation circuit of voltmeter and ammeter
Experiment 30 universal switch and voltmeter to measure the three-phase circuit voltage wiring circuit
Experiment 31 Five-hole socket wiring
Experiment 32 A current transformer uses current wiring
Experiment 33 Dual current transformer connected to incomplete star circuit
Experiment 34 Three current transformers connected to a star circuit
Experiment 35 Dual Current Transformer Differential Connection Wiring
Experiment 36 Three current transformers connected to the triangle circuit