MR010R Water Chilling Plant Trainer Teaching Equipment Refrigeration and Air Conditioner Training
To study the chilling plant and its working cycle.
0.5-1 TR
a) Compressor: hermetically sealed compressor
b) Condenser: Air Cooled condenser made out of copper pipe & Aluminum fins of matching capacity with fan cooling
c) Evaporator: Copper Coil Limpeted water jacket. The evaporator is insulated from outside to prevent heat loss
d) Expansion device: Capillary Tube
e) Energy Meter: for power measurement of compressor
f) Pressure Gauge: 2 Nos. for H.P., L.P. measurement
g) Suitable filter/drier
h) Hand Shut Off type Service valve
i) Rotameter for Refrigerant flow measurement
j) Set of thermocouples
a) Channel Digital Temperature Indicator
b) HP-LP Cut out: To the standard
c) Switches: For compressor & condenser fan
d) Voltmeter: 0 - 250 V
e) Ammeter: 0 - 15 A
f) Thermostat: To the standard
a) To study all components used in refrigeration system.
b) To study the Vapor compression Refrigeration cycle.
c) To determine the Refrigeration Effect, Work Input, Actual C.O.P., Carnot C.O.P., Theoretical C.O.P., Relative C.O.P., Ton of Refrigeration, and Plant Efficiency.